| Low noise and vibration-free method using rotary excavator |
| Good waterproofing and high rigidity of the wall to protect surrounding structures |
| Smallest settlement of surrounding ground, making it suitable for urban construction |
| Maximize the use of underground space by utilizing the retaining wall of this structure |
| It is a relatively safe process against bad conditions such as excessive groundwater, rock formation, soft ground |
| When the Open-Cut method is applied, the gap of the support is large, so the construction is easy by reducing the interference of earth excavation step and underground frame construction. |
| Requires substantial technical accumulation |
| Continuous design needs to be supplemented for permanent walls |
| Special equipment and plant facilities are large and complex, suitable for the site over a certain scale (about 1300 Special equipment and plant facilities are large and complex, suitable for the site over a certain scale (about 1300㎡) |
| Cost of construction is relatively high. (At the time of simple construction cost comparison) |
| Difficult quality control is required. |
Slurry Wall 6,046㎡, PRD 856m, Earth work 52,493m³
Slurry Wall 3,345㎡
Slurry Wall 7,979㎡, PRD 832m, Earth work 58,662m³
Slurry Wall 6,669㎡, PRD 12,632m, Earth work 227,193m³
Slurry Wall 32,717㎡, Guide wall 857m, PRD 21,324m
Slurry Wall 12,453㎡, PRD 24,134m, Earth work 244,594m³
Slurry Wall 5,220㎡, PRD 1,520m, Earth work 85,811m³
Slurry Wall 5,822㎡, Guide wall 220m
Slurry Wall 16,597㎡, Guide wall 394m, EGM 4,536m
Slurry Wall 9,095㎡, Barrett 134ea
Slurry Wall 6,799㎡, PRD 3,439m, Earth work 109,200m³
Slurry Wall 13,479㎡, CIP 15,925m
Slurry Wall 7,237㎡, PRD 1,606m, Earth work 86,433m³
Slurry Wall 6,761㎡, Guide wall 229m
Slurry Wall 21,563㎡, Guide wall 1,065m
Slurry Wall 8,554㎡, Guide wall 222m
Slurry Wall 16,742㎡, Guide wall 400m
Slurry Wall 14,182㎡, Guide wall 390m
Slurry Wall 7,905㎡, Guide wall 234m
Slurry Wall 4,877㎡, Underpinning 1,868m
Slurry Wall 10,157㎡, PRD 2,623m, Earth work 133,526m³
Slurry Wall 5,536㎡, PRD 1,134m, Earth work 46,365m³
Slurry Wall 4,222㎡, Guide wall 169m
Slurry Wall 8,437㎡, Guide wall 267m, PRD 1,753m
Slurry Wall 8,094㎡, Guide wall 257m
Slurry Wall 9,160㎡, Earth work 251,315m³
Earth work, Slurry Wall 5,339㎡, PRD 3,455m
Slurry Wall 4,096㎡, Guide wall 178m, Underpinning 2,971m
Earth work 40,599m³, Slurry Wall 3,891㎡, PRD 669m
Earth work 128,865m³, Slurry Wall 8,001㎡, PRD 3,330m
Earth work 157,987m³, Slurry Wall 7,193㎡, PRD 9,971m
Earth work 126,462m³, Slurry Wall 8,475㎡, PRD 2,020m
Earth work 59,140m³, Slurry Wall 5,807㎡, PRD 1,639m
Slurry Wall 10,102㎡, PRD 8,120m
Slurry Wall 4,361㎡
Slurry Wall 28,795㎡, PRD 16,943m
Slurry Wall 6,044㎡, PRD 915m
Slurry Wall 7,157㎡
Earth work, Slurry Wall 11,768㎡
Earth work, Slurry Wall 9,335㎡, PRD 1,704m
Slurry Wall 34,188㎡
Earth work, Slurry Wall 8,601㎡, PRD 1,416m, Barrette 3,268㎡
Slurry Wall 9,106㎡
Earth work, Slurry Wall 12,955㎡, PRD 17,033m
Earth work, Slurry Wall 4,056㎡, PPS
Earth work, Slurry Wall 11,383㎡, Barrette 10,556㎡
Earth work, Slurry Wall 6,352㎡, PRD 1,642m
Earth work, Slurry Wall 9,547㎡, PRD 2,371m, Barrette 965㎡
Earth work, Slurry Wall 26,031㎡, Barrette 37,769㎡, DCM 248,920m
Earth work, Slurry Wall 4,206㎡, H-Pile 1,509m
Earth work, Slurry Wall 9,250㎡, PPS 1,548m
Slurry Wall 5,725㎡, PPS 855m
Earth work, Slurry Wall 4,670㎡, PRD 904m, Underpinning 728m
Earth work, Slurry Wall 3,726㎡, PRD 1,238m, Underpinning 2,942m
Earth work, Slurry Wall 10,799㎡, PRD 3,795m
Earth work, Slurry Wall 6,921㎡, PRD 2,283m
Earth work, Slurry Wall 13,901㎡, PRD 8,364m, S-Pile 3,562m
Earth work, Slurry Wall 5,333㎡
Earth work, Slurry Wall 8,000㎡, PRD 3,349m
Earth work, Slurry Wall 8,175㎡, Barrette 7,950㎡,