Slurry Wall (Diaphragm Wall)



Introduction


  • A method on site concreting of Slurry Wall is used to build reinforced concrete wall sequentially while excavating the ground using underground excavation equipment, a rotary excavator, and filling the Bentonite stabilizer liquid to prevent the hollow wall collapse.
  • This method started to be applied to dam construction site in Europe in 1950s. In Korea, It was introduced into construction of Yeouido Lucky GumSung office building in the early 1980s.
  • In the early stage of introduction Clamshell excavation method which is impact technique using Hang Grab was used. However, after development of Hydrofraise, rotating Hydraulic excavation equipment, it turns non-impact excavation technique,
  • thus it is possible to construct the wall the deep depth as it minimizes impact of the vibration on the field, develops straightness, and improves the quality of the joint between the panel by cutting the construction wall.

Summary


  • Application of construction method Slurry Wall is used as earth retaining wall or waterproof wall, thus it is diversely applied to underground structures, subsurface dams, subways, underground roads, underground storage, construction wall, Barrette pile, Dam base, and foundation of bridge structure.

  • Slurry Wall Construction View
Slurry Wall Construction View
  • Method Introduction
Method Introduction
① Primary excavation ② Primary Panel 1st Byte Excavation ③ Primary Panel 2nd Byte Excavation④ Primary Panel Center Byte Excavation ⑤ Placing of steel reinforcement and Concreting

Method Introduction
⑥ Another Primary Penel Excavation and Concreting ⑦ Trailing Panel Excavating ⑧ Placing of steel Reinforcement of Trailing Panel and Concreting ⑨ Repeated Excavation of Primary and Trailing Panel

Advantages

Low noise and vibration-free method using rotary excavator
Good waterproofing and high rigidity of the wall to protect surrounding structures
Smallest settlement of surrounding ground, making it suitable for urban construction
Maximize the use of underground space by utilizing the retaining wall of this structure
It is a relatively safe process against bad conditions such as excessive groundwater, rock formation, soft ground
When the Open-Cut method is applied, the gap of the support is large, so the construction is easy by reducing the interference of earth excavation step and underground frame construction.

Disadvantages

Requires substantial technical accumulation
Continuous design needs to be supplemented for permanent walls
Special equipment and plant facilities are large and complex, suitable for the site over a certain scale (about 1300 Special equipment and plant facilities are large and complex, suitable for the site over a certain scale (about 1300㎡)
Cost of construction is relatively high. (At the time of simple construction cost comparison)
Difficult quality control is required.

Equipment Introduction


Rotary excavator (HYDRO FRAISE TRENCH CUTTER)


  • Hydrofraise will be equipped with Heavy Duty Crane, and two Cutter Drums in the lower part of body attached with TIP made of Tungsten Carbide material spin counter of each other by means of hydraulics, and keep excavating. Power Pack equipped with Crane provide hydraulics to Motor that drives Drum inside of Hydrofraise, and to Bentonite Slurry, as well as to Motor that drives high-performance pump which pull out and lift the excavated earth and sand, and smashed rock.
  • Steel Frame of the Body induces vertical excavation, and it consists of Body Frame and Guide Frame that are designed to maintain a constant speed for Drum rotation and excavation according to Hydraulic Feed Cylinder.
  • Cutter of HYDROFRAISE shapes the joint while cutting the joint region of leading type panel already casted concrete less than 10cm, so it does not need joint mechanics separately. Whole process is continued having circulated Bentonite liquid and the excavated earth and sand together, so that it has advantage in that it is possible for concreting right after excavation.
  • Excavation by HYDROFRAISE can be widely practiced in the variety of soil condition (clay, sand, gravel stratum, underlying rock formation), and excavation speed is in inverse proportion to the degree of soil’s firmness.
  • (Crushing Strength - 500~1000kg/㎠) There is no vibration during excavating, thus it is very suitable excavator to be used for construction within the downtown area. Having equipped with precise Inclinometer that measures precise straightness, it has very small margin of error. (less than 0.2%) The depth of excavation, generally, is 60 meters, and it is possible to excavate the depth of maximum 150 meters. So it has a constructability being able to use, under any circumstances, as of exterior walls of the underground structures.

Site list



Seoul Forest Office Building New Construction Project, Seoul

Slurry Wall 6,046㎡, PRD 856m, Earth work 52,493m³

2025

Great Train Express(GTX) Line B, Private Investment Project

Slurry Wall 3,345㎡

2025

Insadong Office Building, Seoul

Slurry Wall 7,979㎡, PRD 832m, Earth work 58,662m³

2025

Udong 2nd district redevelopment project, Busan

Slurry Wall 6,669㎡, PRD 12,632m, Earth work 227,193m³

2024

Goyang Janghang District M-1 Block Apartment Complex

Slurry Wall 32,717㎡, Guide wall 857m, PRD 21,324m

2024

Icheon Anheung-dong local housing association apartment complex construction project

Slurry Wall 12,453㎡, PRD 24,134m, Earth work 244,594m³

2024

Seongsu-dong 2-ga Office Building, Seoul

Slurry Wall 5,220㎡, PRD 1,520m, Earth work 85,811m³

2024

Dangsan Rental Housing Construction

Slurry Wall 5,822㎡, Guide wall 220m

2023

Sinpyeong Knowledge Industry Center, Busan

Slurry Wall 16,597㎡, Guide wall 394m, EGM 4,536m

2023

Busan Believe Myeongji Duclass new construction construction*

Slurry Wall 9,095㎡, Barrett 134ea

2022

Cheonggye Regional Housing Association Residential Complex

Slurry Wall 6,799㎡, PRD 3,439m, Earth work 109,200m³

2022

Hyundai Motor Group GBC, Section 2, Seoul

Slurry Wall 13,479㎡, CIP 15,925m

2021

Godeok Biz Valley Self-sufficient District 2-3 Business Facility, Seoul

Slurry Wall 7,237㎡, PRD 1,606m, Earth work 86,433m³

2021

Yongsan International B/D, District 5, Seoul

Slurry Wall 6,761㎡, Guide wall 229m

2021

Hillstate The Unjung, Paju

Slurry Wall 21,563㎡, Guide wall 1,065m

2021

Cheongju Express Terminal (Residential-Commercial Complex)

Slurry Wall 8,554㎡, Guide wall 222m

2021

Cheongju Express Terminal (Terminal)

Slurry Wall 16,742㎡, Guide wall 400m

2021

Magok District CP4 Development Project

Slurry Wall 14,182㎡, Guide wall 390m

2021

Great Train Express(GTX) Line A. Section 3

Slurry Wall 7,905㎡, Guide wall 234m

2021

Goyang Deokeun District Commercial Building

Slurry Wall 4,877㎡, Underpinning 1,868m

2020

Dangsan-dong Youth Housing, Seoul

Slurry Wall 10,157㎡, PRD 2,623m, Earth work 133,526m³

2020

Yeouido Meritz site officetel, Seoul

Slurry Wall 5,536㎡, PRD 1,134m, Earth work 46,365m³

2020

Sangam Data Center, Seoul

Slurry Wall 4,222㎡, Guide wall 169m

2020

Incheon Cheongna B5-1-1BL Business Facility

Slurry Wall 8,437㎡, Guide wall 267m, PRD 1,753m

2020

Yangsan Jungbu Residential Complex, Yangsan

Slurry Wall 8,094㎡, Guide wall 257m

2020

Namyangju DasanJigeum Officetel

Slurry Wall 9,160㎡, Earth work 251,315m³

2020

Jayang-dong the Raum office B/D, Seoul

Earth work, Slurry Wall 5,339㎡, PRD 3,455m

2019

Magok May Place New Construction, Seoul

Slurry Wall 4,096㎡, Guide wall 178m, Underpinning 2,971m

2019

Seongsu-dong Gentle Monster, Seoul

Earth work 40,599m³, Slurry Wall 3,891㎡, PRD 669m

2019

Sewoon Redevelopment Project (Section 3-1, 4, 5), Seoul

Earth work 128,865m³, Slurry Wall 8,001㎡, PRD 3,330m

2019

Moraenae & Seojung Market Redevelopment Project, Seoul

Earth work 157,987m³, Slurry Wall 7,193㎡, PRD 9,971m

2019

Gasan Biz Metro 2nd, Seoul

Earth work 126,462m³, Slurry Wall 8,475㎡, PRD 2,020m

2019

Incheon Cheongna B5-1-1BL Business Facility

Earth work 59,140m³, Slurry Wall 5,807㎡, PRD 1,639m

2019

Busan Station Samhan Golden View Edu Station

Slurry Wall 10,102㎡, PRD 8,120m

2018

Misa District Central Commercial Area 11-1BL, Hanam

Slurry Wall 4,361㎡

2018

Gwangmyeong Station Complex Complex PF Project Phase 2

Slurry Wall 28,795㎡, PRD 16,943m

2018

Cheongna Office B/D( C3-19BL), Incheon

Slurry Wall 6,044㎡, PRD 915m

2018

Yeongjongdo Seaside Park Residence

Slurry Wall 7,157㎡

2018

Sasang Regional Housing Association APT, Busan

Earth work, Slurry Wall 11,768㎡

2018

Desian Studio, Busan

Earth work, Slurry Wall 9,335㎡, PRD 1,704m

2018

Daebang DM City, Busan

Slurry Wall 34,188㎡

2017

MVL Hotel 2nd

Earth work, Slurry Wall 8,601㎡, PRD 1,416m, Barrette 3,268㎡

2017

Noryangjin Dream Square, Seoul

Slurry Wall 9,106㎡

2017

Misa District Central Commercial Area 12-1BL, Hanam

Earth work, Slurry Wall 12,955㎡, PRD 17,033m

2017

Seongsu-dong Pekotech Building

Earth work, Slurry Wall 4,056㎡, PPS

2017

Goyang Tourism Culture Complex (O1BL) Business Facility

Earth work, Slurry Wall 11,383㎡, Barrette 10,556㎡

2017

Kolmar Korea R&D Center, Seoul

Earth work, Slurry Wall 6,352㎡, PRD 1,642m

2017

Chungju AdministrationTown koaroo Hutis

Earth work, Slurry Wall 9,547㎡, PRD 2,371m, Barrette 965㎡

2017

Royal Palce Busan Newport Tier 1,2

Earth work, Slurry Wall 26,031㎡, Barrette 37,769㎡, DCM 248,920m

2016

Sangam-dong DMC Parking Complex, Seoul

Earth work, Slurry Wall 4,206㎡, H-Pile 1,509m

2016

Pyungchon Highfield knowlegde Industry Center

Earth work, Slurry Wall 9,250㎡, PPS 1,548m

2016

Yangsan U-Top Ubless Skyview, Gwangju

Slurry Wall 5,725㎡, PPS 855m

2016

Cheongna Diostel, Incheon (C14-1BL)

Earth work, Slurry Wall 4,670㎡, PRD 904m, Underpinning 728m

2016

Misa Station Hyosung Harrington Tower

Earth work, Slurry Wall 3,726㎡, PRD 1,238m, Underpinning 2,942m

2016

Kimpo Pungmu 2 zone E-mart

Earth work, Slurry Wall 10,799㎡, PRD 3,795m

2016

Misa E-Pyeonhansesang APT

Earth work, Slurry Wall 6,921㎡, PRD 2,283m

2016

Wirye E-mart Town

Earth work, Slurry Wall 13,901㎡, PRD 8,364m, S-Pile 3,562m

2016

Nice Group 1 company building

Earth work, Slurry Wall 5,333㎡

2016

Haeundae Dongwon vista , Busan

Earth work, Slurry Wall 8,000㎡, PRD 3,349m

2016

Kimpo Marinabay Hotel

Earth work, Slurry Wall 8,175㎡, Barrette 7,950㎡,

2016